国产麻豆天美果冻无码视频,天美传媒AV成人片免费看,天美麻花星空高清mv,星空无限传媒官网免费,星空无限传媒免费观看电视剧,麻花天美星空MV免费观看完整版,天美传媒妇乱XXXXX视频,天美麻花星空高清免费观看完整版影视,星空无痕MV免费观看麻花影视,天美传奇星空MV高清免费,麻花星空无限传媒有限公司官网

網(wǎng)站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

電力電纜排管質量缺陷與防治詳解

山東電纜橋架廠家給大家整理了電力電纜排管質量缺陷與防治方法,希望那個對大家有所幫助!
Shandong Cable Bridge Frame Manufacturer has sorted out the quality defects and prevention methods of power cable piping, hoping that it will be helpful to you all! 
1.問題:基槽開挖內部積水
1. Problem: Water accumulation in foundation trench excavation
隱患:基坑積水浸泡后,地基土質變軟,承載力降低其,引起管渠基礎下沉,造成管渠結構折裂損壞
Hidden danger: After the foundation pit is immersed in water, the foundation soil becomes soft and the bearing capacity decreases, which causes the subsidence of the foundation of the pipeline and canal, and causes the fracture and damage of the structure of the pipeline and canal.
原因分析:1)自然降水或其它落水流進基槽,造成積水;
Reason analysis: 1) Natural precipitation or other falling water flows into the foundation trough, causing water accumulation;
2)地下水、滯水,未采取排降、降水措施
2) Groundwater, stagnant water, no drainage and precipitation measures
預防措施:1)雨季施工,須將基槽周邊開挖排水溝,防止落水流入槽內;
Preventive measures: 1) In rainy season construction, drainage ditches should be excavated around the foundation trench to prevent water falling into the trench;
2)排水溝應接通原排水管網(wǎng),開槽宜在枯水期施工;
2) Drainage ditches should be connected to the original drainage network, and grooving should be constructed in dry season.
3)在地下水位以下或有淺層滯水地段挖槽,應采用排水溝、集水井、井點排降水措施;
3) Drainage ditches, catchment wells and well-point drainage measures should be adopted to dig ditches below the groundwater level or in shallow water-holding areas.
4)按照設計要求做好放坡施工
4) Sloping construction according to design requirements
山東電纜橋架
2.問題:排管不整齊,回填不規(guī)范
2. Problem: Unorderly drainage and irregular backfilling
隱患:管道擠壓變形,降低使用壽命
Hidden danger: pipe extrusion deformation, reduce service life
原因分析:1)未按照設計、規(guī)范施工;
Reason analysis: 1) Failure to comply with design and specification of construction;
2)回填土用雜物回填
2) Sundries Backfilling for Backfilling
3)質量管理不到位,工程驗收不細致。
3) The quality management is not in place and the project acceptance is not meticulous.
預防措施:1)嚴格按照作業(yè)指導書、規(guī)范施工
Preventive measures: 1) Construction in strict accordance with operation instructions and specifications
2)按規(guī)范整齊安裝排管,并進行固定;
2) Install and fix the pipes neatly according to the specifications;
3)回填前應坑內積水、雜物等,回填土應每300mm夯實一次,后必須培出高于地面300mm的防沉層
3) Water and debris in the pit should be removed before backfilling. The backfill should be compacted every 300 mm. Finally, the Anti-subsidence layer 300 mm above the ground must be cultivated.
好了,今天的內容就先給大家介紹到這里了,收藏山東電纜橋架廠家官網(wǎng):http://www.zrbg1.com,可以了解更多詳細信息!
Okay, today's content will be introduced to you first, collect the official website of Shandong Cable Bridge Manufacturer: http://www.zrbg1.com, you can learn more details!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
成人午夜视频精品一区| 亚洲精品久久久久58| 九热精品视频| 激情五月天小说| 国产午夜精品AV一区二区| 性爱视频一区二区三区| 国产精品爱| 色5月婷婷| 成人无遮挡18禁免费视频| 日韩不卡免费视频| 无码人妻熟妇av又粗又大一| 亚洲无码18| 麻豆精产国品免费免费观看高清| 亚洲一区二区小说| 日韩一区免费| 久久久久久久久久毛片| 免费的男女视频网站推荐| 97在线观视频免费观看| 91丨porny丨人妻露出| 五月丁香久久| 综合网婷婷| 激情亚洲天堂| 插插插色综合| 日本不卡一区| 精品一区二区三区AV天堂| 久久精品A| 亚洲一区二区三区日韩| 强伦人妻BD在线电影| 欧美99视频| 精品综合久久| 日本丰满熟妇bbxbbxhd| 大地资源中文在线观看免费 | 久久99这里只有精品国产| 三级片二区| 91香蕉| 成全视频免费高清游戏| 国产123区在线观看| 婷婷五月丁香综合| 麻豆影视文化传媒app官网进入| 日韩无码毛片| 欧美综合在线观看|