国产麻豆天美果冻无码视频,天美传媒AV成人片免费看,天美麻花星空高清mv,星空无限传媒官网免费,星空无限传媒免费观看电视剧,麻花天美星空MV免费观看完整版,天美传媒妇乱XXXXX视频,天美麻花星空高清免费观看完整版影视,星空无痕MV免费观看麻花影视,天美传奇星空MV高清免费,麻花星空无限传媒有限公司官网

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

濟(jì)南電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(槽)或梯架直線段、彎通非直線段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線銅芯接地線,接地線小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無與其他設(shè)備、管線交叉或重疊無法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無蓋無孔封閉型托盤,當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤或有孔托盤及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤或梯架時(shí),應(yīng)選用中間有隔板的托盤或梯架;在托盤、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩?;因受空間條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤、橋架規(guī)格的承載能力應(yīng)滿足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤、梯架直線段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠檢驗(yàn)報(bào)告。托盤、梯架板材厚度應(yīng)滿足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤、橋架鍍層表面應(yīng)均勻,無毛刺、過燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠日期電纜相應(yīng)完好無損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀完好無損,鎧裝無銹蝕、無機(jī)械操作,無皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線袋或畫線沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線或畫線,并均勻檔距畫出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無顯著變形,焊接前厚度超過4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以內(nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

  (8)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線段結(jié)合處300~600mm的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿足規(guī)范小彎曲半徑。見表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開角螺栓,用開角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線上。制作見圖和表3.1.5(3)底架與門型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線段鋼制電纜橋架長(zhǎng)度超過30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線,接地線小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線連接。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)托盤、梯架應(yīng)小有一點(diǎn)與接地干線可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線工程的一個(gè)配套項(xiàng)目,目前尚無專門的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說明,也可分段標(biāo)出用不同的剖面圖、單線圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線垂直敷設(shè)時(shí),在纜線的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開啟面應(yīng)保持80毫米的垂直凈空,線槽截面利用率不應(yīng)超過50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線槽的纜線可以不綁扎,槽內(nèi)纜線應(yīng)順直,槽內(nèi)纜線應(yīng)順直,盡量不交叉,纜線不應(yīng)溢出線槽,在纜線進(jìn)出線槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線槽布放纜線應(yīng)每間隔1.5米固定在纜線支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線槽中敷設(shè)線時(shí),應(yīng)對(duì)纜線進(jìn)行綁扎。4對(duì)線電纜以24根為束,25對(duì)或以上主干線電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線的類型、纜徑、纜線芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見表橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套?! ?、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求?! ?、橋架橫截面積的選擇見表   橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由  濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://www.zrbg1.com/  真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.zrbg1.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
91淫黄大片| 老湿机69| 亚洲自拍偷拍视频| 久久青草费线频观看| 香港三日本三级少妇99| 亚洲少妇性爱| 日本电影一区二区三区| mdapptv麻豆下载| 四房播播色五月| 欧美福利在线视频| 欧美熟妇BB| 欧美日韩国产中文字幕| 麻豆传煤网站入口直接进入不用| 久操综合在线| AV小说免费看| 日韩一区二区三区四区五区| 麻豆视传媒APP官方网站入口| 最近中文字幕高清字幕免费MV | 欧美久久一区二区| 久久黄视频| 四平青年完整版高清| 色色色综合网| 一级片少妇| 亚洲AV日韩AV无码| 精品3d动漫区在线播放| 日韩三级成人| 91福利视频网站| 黄片免费视频| 大地资源二中文官网入口| 日韩免费黄色| 国产女主播在线观看| 日日骑夜夜操| 色琪影院八戒无码| 国精品人妻无码一区二区三区牛牛| 无码网页| 成人精品视频99在线观看免费| 巨胸美女狂喷奶水www网麻豆| 无码三区四区| av天堂影视| 久久久久久人妻一区二区三区| 日本网址在线观看| 国产美女被干| 麻豆网站视频| 91在线视频免费91| 深夜影院| 无码熟妇AV又粗又大| 亚洲精品国产精| 大地资源网在线观看免费官网| 麻豆69| 午夜福利体验区| 久久精品无码AV| 日韩精品一区二区三区AV在线观看 | 婷婷四房播播| 欧美精品一区二区在线观看| 最新乱伦网站| 万人斩社区在线视频| 精品不卡高清视频在线观看| h视频免费在线观看| 国产视频综合| 99久久国产宗和精品1上映| 中文字幕精品亚洲熟女| 亚洲欧美综合一区| porn在线视频一区二区| av午夜电影| 国产精品99久久久久久人| 麻豆视传媒黄app| 售楼部丝袜美腿人妻| 日韩三级网| 无码精品人妻一区二区| 日本高清一二三区视频在线| 深爱激情五月丁香| 久99久热只有精品国产99| 青青草原高清无码| 久久久久久毛片免费播放| 扒开粉嫩尿口露出大胸美女| 中文字幕亚洲专区| 免费黄av| 国产丰满人妻一区二区电影 | 日韩黄片在线看| 日韩综合网| 亚洲精品AV中文字幕在线| av天天操| 性生交大片免费看淑女出招| 日韩成人无码一区二区视频| 中文字幕综合| 欧美ⅹxxxx18性欧美| av二区三区| 毛片毛片毛片| 高清无码成人视频| 六月婷婷色| 精品AV综合导航| www.久久久久.com| 国产成人综合欧美精品久久 | 国产精品传媒视频| 麻豆视传媒官方网站入口进入| 国产精品久久久久久99| 日本不卡高字幕在线2019| 亚洲欧美中文无码蝴蝶| 成人免费视频一区二区三区| 欧美巨大巨粗黑人性AAAAAA| 天堂在线国产| 激情六月丁香| 凹凸久久人人澡超碰凹凸| 久久伊| 婷婷五月天综合| 老司机午夜视频| 日日干夜夜操麻豆一级| 精品无码一区二区三区狠狠| 国产麻豆操逼视频| 精品无码一区二区三区爱欲| 大尺度做爰视频吃奶WWW| 超碰人人AV| 欧美国产激情| 久久66热人妻偷产国产| 黑人毛片免费看| 欧美另类国产| 99r8这是只有精品视频20| 96国产视频| 久久国产一区| 久久99这里只有精品国产| 国产精品视频| 2019最新国产理论| 国产真人毛片| av一二三区| 91av视频在线观看| 麻豆三级| 亚洲色无码A片一区二区情欲 | 日本视频免费观看的网站| 色色电影网址| 无码一二三区| 精品人妻伦一二三区久久AAA片 | 日产亚洲一区二区三区| 最近中文字幕完整版2019| 色蜜桃av| www.欧美| 日本在线高清| 欧洲AV无码| 国色天香精品一卡2卡3卡老狼 | 亚洲MV砖码砖专一2020| 国产黄色高清| v片在线观看| 2020最新国产自产精品| 免费特级黄毛片| 无码人妻丰满熟妇A片护士M| 色吆吆| 暖暖 免费 高清 中文视频在线观看 | 国产日日干| 高清萌白酱国产福利甜味弥漫| 手机在线一区二区三区| 日韩熟女一区| 2021一本久道| 国产精品电影久久| 极品美鲍一线天| 蜜桃视频官网| 麻豆传煤网站APP下载| 国产免费成人网站| 久久无码区| 成人宗合网| 尤物一区二区| 午夜精品久久久久久影视riav| 日韩精品中文字幕一区二区三区| 欧美ⅹxxxx18性欧美| a∨色狠狠一区二区三区| 拔擦拔擦8X永久华人免费播放器| 久久三级片电影| 亚洲小穴| 精品国产人妻| 中文字幕中出| 国产亚洲精品久久久久久777| 日日爽| 免费AV黄片| 人妻无码精品| 2020中文字字幕在线不卡 | 免费AV在线| 久久久久999| 琪琪电影网| 五月色丁香婷婷网蜜臀AV| 男人的j插入女人的p| 久久青草在线视频精品| 无码天堂网| 99国产精品久久久久久久久久久| 欧美极度另类| 国内精品自在自线视频| 亚洲精品在线观看AV| 2019午夜福利4000| 99久国产| 天堂草原网| 精品人妻一区二区三区蜜桃视频| 内射中出| 无码人妻丰满熟妇区五十路| 日韩Aⅴ一区二区三区| 人人妻人人澡人人爽人人欧美一区| 久久aa| 精品九九视频| 91麻豆精品国产9久久久| 国产精品一亚洲av日韩av欧| 欧美日韩一区精品| 亚洲 美腿 欧美 偷拍| 亚洲少妇网站| 开心五月综合亚洲| 国产a级网站| 日本污ww视频网站| 日韩AV电影一区二区| 久久影院视频| 久草热视频| 成人婷婷五月天| 久久伊人精品| 波多野结衣无码aV在线播放| 99视频偷窥在线精品国自产拍| av久草| 国产精品亚欧美一区二区三区| 色欲com| 丰满少妇猛烈进入A片K8经典| 国产老熟妇乱XXXXX| 亚洲人日本人jlzzy| 啪啪免费视频| 人妻凹凸人妻少妇| 日本-区一区二区三区A片| 亚洲天堂日本| 韩国日本中国美国产| 夜夜夜影院| 欧美国产日产一区二区| 免费毛片视频| 一区二区三区黄色电影| 成人无码精品1区2区3区免费看| 吞精囗交69激情欧美| 亚洲jav| 久久人人爽人人爽人人AV| 亚洲精品久久久久久偷窥| 99精品视频在线观看| 国产 亚洲 丝袜 中文 综合| 麻豆文化传媒官方网站入口| 一区二区三区无码按摩精电影| 亚洲精品国偷拍电影自产在线| 亚洲性色av| 又粗又大又爽免费视频| 最近中文字幕高清免费MV | 亚欧洲乱码视频在线专区网站| 69视频成人| 久久不卡视频| 国产亚洲精品久久久久久打不开| 国色天香社区在线视频高清| 久久精品精品无码一区三区| 狠狠久久久| 成人区精品一区二区不卡AV免费| 亚洲欧美激情在线| 三级福利片| 亚洲精品久久久AV无码专区| 久久AV网址| 妇女性内射冈站HDWWW000| 无码人妻精品一区二区中文| 8x8ⅹ国产精品一区二区| 欧美激情综合五月色丁香| 国产高清免费| 欧美乱伦网址| 乳尖乱颤娇喘连连A片在线观看 | 西瓜影院| 成人一级黄片| 麻豆一区二区免费播放网站| 99re在线视频| 国产av资源站| 亚洲一区综合| 52色擼99热99RE超碰| 人妻在线看| 高清无码视频免费| 久久视频这里只精品99| 欧美天天爽| 亚洲黄色免费| 中文字幕在线观看亚洲视频| 无码精品人妻一区二区湖北九色| 狂野欧美性猛交blacked| 丁香成年社区| 天天色综合色| 国产一级特黄大片色 | 日本午夜小视频| MD短视频传媒免费版怎么下载| 午夜精品无码一区二区三区| 婷婷超碰| 国产伦精品一区二区三四区演员| 精品深夜AV无码一区二区老年| 真实国产乱伦| 亚洲一区久久久| 99精品国产乱码久久久人妻| 欧美日韩免费网站| 夫妻3P视频| 暖暖日本免费观看更新2019| 久久久强奸| 亚洲一区二区三区四区五区 | 麻豆视传媒官方网站入口在线| 国产精品国产精品国产专区不卡| 黄色小说视频网址| 亚洲精品国偷拍自产在线观看蜜臀 | 99久RE热视频这里只有精品6| 乱伦一级片| 欧美成人免费看| 欧洲操逼视频| 久久丫线这里只精品| 精品久久一区| 亚洲五区| 视频在线一区| 成全在线观看免费观看大全| 99久久国产免费| 亚洲中文字幕网| 无码电影一区二区| 日产高清卡一卡二卡VA| 亚洲成人一区| 91激情网| 色久综合网| 无毒成人网站网址| 国产无遮挡免费猛烈视频在线观看| www.日韩精品| 国产精品一区二区欧美| 日欧精品卡2卡3卡4卡| 国产精品99久久| 亚洲熟女色图| 美女黄在线观看| 开心五月综合亚洲| 亚洲精品久久久久久一区二区| 亚洲人色| 丰满少妇高潮久久三区| 污污内射久久一区二区欧美日韩| 深夜迷情| 人妻のav波多野结衣| 大香蕉久操| AV网站在线看| 午夜石榴视频| 久久久国产精品人人片| 久久精品—区二区三区舞蹈| 日韩五十路熟女| 2017最新h无码动漫| 无码日本精品一区二区片| 国产精品99无码一区二区| 人人99| 麻豆国产成人AV在线| 午夜精品视频| www国产视频| 国产专区第一页| 欧美性爱zoo| 大地影视资源官网入口| av无码精品一区二区三区宅噜噜 | 四平青年电影完整版| 9l人人澡人人妻人人精品| 国产九一精品| 欧洲一区二区| 中文字幕亚洲精品影院| 免费撕开奶罩揉吮奶头A片视频| 成人在线无码| 性做久久久久久久| 久久国产乱子伦精品一区二区小说| 国产在线久| 99热99| 都市激情 清纯唯美 制服诱惑 在线视频 | 国产人成精品| 影视影院| AV小电影网站| 国产激情片| 最好最新高清中文字幕| 69久久国产精品热88人妻| 九九电影网| av天堂最新| 国产精品久久久久久久av超碰| 日本精品久久久久中文人妻| 午夜福利合集1000| 国产AV国片精品一区二区| 亚洲乱码日产精品BD在线下载| 久久人妻少妇| 人妻のav波多野结衣 | 亚洲伦理一区二区三区| 日本激情一区二区| 国产一线二线三线网站| 最近中文字幕高清中文字幕2018| 欧美成人国产一区二区| 阿v天堂在线| 国产精品无码二区| 亚洲一区二区综合| 日本熟妇丰满毛茸茸| 美女久久精品| 国产调教视频网站入口| 91精品国产综合久久久不卡电影| 综合久久婷婷| 丁香网址| 成全片大全| 秋葵加油站APP下载地址入口| 久久9999久久免费精品国产| 亚洲avapp| 日本潮喷| 国产精品乱码久久久| 精品国产乱码久久久久| 色情欧美一区二区久久夜爽| 麻豆传媒免费观看| 国产青草视频| 无码福利在线| 99re热精品视频| 日本精品无码一区二区三区久久久 | 999亚洲国产精华液| 激情五月天小说| 综合网在线视频| 日韩后入| 免费看污网站| 日日操夜夜操狠狠操| а天堂中文在线官网| 国产91女技师在线观看| 日本高清三区| 欧美天天视频| 一级毛片日韩| 天天干天天操天天做| 99re8在线精品视频免费播放| 亚洲JIZZJIZZ女人| 亚洲色偷偷男人的天堂| 久久精品国产亚洲AV蜜臀| 大地资源中文在线观看| 麻豆影视国产TV在线观看| md传媒免费资源在线观看下载| 国产精品福利在线| 免费三级网| 老子影院| 人妻含泪被黑人进入| 亚洲涩涩网| 日本精品一区| 精品欧美一区二区久久久| 色窝窝无码一区二区三区| 亚洲视频综合| 亚洲图片无码| 一区二区三区久久| 久久久久无码精品| 午夜激情小说| 亚洲天堂中文字幕| 婷婷四色| 久久99免费| 国产+高潮+白浆+无码| 国产精品色呦呦| 秋霞毛片| 日韩精品久久久久| 97视频在线| 日韩欧美一区二区三区久久婷婷| 久99久久久无码精品国产| AAAAA级少妇高潮大片免费看| 久久久久久久福利| 欧美一级免费| 无码国产精品一区二区高潮| 亚洲涩涩网| 羞羞影院| 亚洲视频二区| 中文字幕日韩精品有码视频| 亚洲精品AV无码永久无码| 麻豆视传媒短视频官方网站在线观看 | 国产高清黄片| 亚洲欧美在线不卡| 国产av熟妇人震精品| 亚洲欧美一区二区三区在线观看| 欧美乱轮视频| 女人高潮被爽到呻吟在线观看| 欧美视频导航| 四川丰满少妇被弄到高潮| 三级在线无码| 日本猛少妇色xxxxx猛叫| 无码精品人妻一区二区三区湄公河| 在线观看黄色片| 成熟YIN荡美妞A片视频麻豆 | 色婷婷久久久亚洲一区二区三区| 欧美综合在线观看| 五月丁香激情综合久久| 久久久久久久极品内射| 国产精品 亚洲无码| 亚洲色欲一区二区| 久一区久久蜜桃| 亚洲AV 日韩 国产 有码| 0855午夜福利| 亚洲愉拍自拍另类图片| 日本一卡2卡3卡4卡无卡免费网站| 亚洲色欲国产免费视频| 99久久点在线精品| 无码久| 午夜视频黄色| 久久久亚洲一区| 操你综合| 欧美久久一区| 免费九九视频| 一区二区中文字幕| 麻花豆剧国产MV在视频| 成人免费视频caoporn| 同性双男A片又黄又刺激小说免费| 中文字幕AV久久一区二区| 精品国产久久久久| av午夜电影| 偷玩朋友漂亮醉酒人妻| 香蕉av一区| 日本乱伦中文字幕| 久久怡红院| 成人午夜A片999影视| 国产成人精品综合在线| 2020亚洲 欧洲 日产 韩国| 2022四虎4HU新地址入口| 日韩无码av免费观看| 久久久久久色| 亚洲AV成人无码网站天堂久久| 91激情网| 69精品人人| 内射少妇视频| 日本-区一区二区三区A片| 亚洲AV成人无码久久精品A片| 丁香社区网站| 国产免费一区二区三区最新不卡| 又粗又大又黄的视频| 性欧美潮喷水口乱喷| 久草久草久草久草| 丁香花在线影院观看在线播放| 久久这里只精品热在线99| 成全高清视频免费观看| 日韩黄色电影免费看| 精品人伦一二三区免费| 麻豆精品无码国产| 91欧美在线| 久久9精品区-无套内射无码| 久久国产亚洲精品| 午夜dj在线观看免费完整直播| 91香蕉视频免费| 亚欧美性爱| 亚洲一区二区精品视频| 欧美日韩免费网站| 欧美一区二区三区婷婷五月| 最近2018年中文字幕免费下载| 久久91精品国产91久| 国产精品ww| 少妇做受高潮| 丁香五月婷婷在线| 国产中的精品AV一区二区| 熟妇网| 国产ZZJJZZJJ视频全免费| 激情内射日本一区二区三区| 99热在线这里只有精品| 日本h在线| 99婷婷| 做暧暧视频在线观看2019| 大地资源网中文在线观看免费节目| 囯产精品无码一区二区久久| 黑人与饥渴少妇在线| 久久综合一本| 亚洲精品综合五月久久小说| 亚洲免费视频在线| nba录像回放| 孕交| 久久久亚洲一区少妇无码| 日韩123区| 少妇饥渴偷公乱第一章全文| 国产精品蜜臀Av| 91人妻人人做人碰人人爽| 日干夜干天天干| 色婷婷亚洲婷婷7月| 亚洲情综合五月天| 不卡的aV在线观看| 69精品人人槡人妻人人玩蜜桃| 久久国内精品自在自线| 五月婷婷丁香花综合网| 成人欧美18| 国产精品一区二区三区电影| 午夜神马| 国产下药迷倒白嫩丰满美女BD| 国产超碰精品| 欧美影院久久| 91精品91久久久中77777| 国产精品日本不卡一区二区| 高清国产一区| 日韩av色色| 日韩欧美综合在线| 蜜桃AV亚洲第一区二区| 黄片av在线免费观看| 免费无码网站| heyzo1754北岛玲在线视频 | 综合色在线| 日本视频免费观看的网站| 97久久人妻| 午夜福利757| 人妻久久久| 日韩一品二品三品| 亚洲中文字幕二区| 性av天堂| 国产两个女同在情趣酒店| 亚洲午夜免费| 岛国av一区| 一本色道久久HEZYO无码| 天堂资源中文| 久久cao| 日韩蜜桃视频| 亚州AV无码乱码色情| 中文字幕天堂| 日韩一区二区三区中文字幕| 欧美国产在线一区| 日韩人妻高清无码| 中文有码在线观看| 人妻一区二区三区| 日本亚洲精品久久蜜臀| 亚一洲一侵犯一区二区三区| 中文字幕精品一区久久久久| 大地影视中文资源6| 中文字幕自拍| 91在线一区| 在线免费观看亚洲视频| 国产精品2020| 无码三级在线观看| 床上做暧暧视频免费| 国产精品久久九九| 日本大香蕉视频| 巨胸喷奶水WWW冈哺乳期| 日老熟妇| 韩日无码视频| 国产香蕉尹人视频在线| 美女张开腿让我操| 亚洲国产无码精品| 无码AV免费精品一区二区三区| 欧美日韩色欲| 国产8区| 老司机给个网站2021| 亚洲无码TV| 草久影院| 97国产精华最好的产品久久久| 黄片中文字幕| 日韩欧美一区二区三区四区| 图片区 亚洲 在线视频| 亚洲美女自拍偷拍| 精品一区二区三区免费视频| 麻豆视传媒黄短视频| 久久97| 忘忧草视频资源在线观看免费| 男人在线观看视频| 无码中文字幕在线| 丰满少妇69激情啪啪无| 97人妻人人揉人人澡人人人妻91| 69精品人人人| 亚洲 综合 图文 偷拍| 日产高清无码| 午夜达达兔理论国产| 手机AV免费看| 四虎影院最新网站| a篇片在线观看快播| 超级碰碰碰| 国产AV一区二区三区人妻| 日韩有码一区二区三区| 国产夫妻在线| 久章草国产在线| 偷玩朋友漂亮醉酒人妻| www.久久久久| 久久人人色| 中文字幕精品一区二区三区精品| 大地影视资源官网入口| 黄片在线网站| 亚洲MV砖码砖专一2020| 乱╳╳╳╳乱精品视频| 亚洲无码你懂的| 青青草app| 国产精品日韩在线| 四房播播网址| 免费久久久| 成人欧美一区二区三区在线观看| 国产热| 欧美日韩操| 69日本xxxxxxxx78| 国产日韩激情| 桃花社区视频在线播放| 欧美成人性生活视频| 天天躁日日躁狠狠很躁男男| 大又大又粗又硬又爽少妇毛片| 亚洲乱熟女香蕉一区二区三区少妇| 大地资源二中文官网入口| 国产午夜福利电影| 麻豆文化传媒免费网址| 综合天堂AV久久久久久久| 亚洲欧美日韩精品一区| 天堂草原影院电视剧| 国产嫖妓自拍| 欧美乱码卡1卡2卡三卡四卡| 九九视频在线| 婷婷四房色播| 久久国产福利| 麻豆文化传媒网站官网免费| 极品久久久| 亚洲成人av无码| 欧美另类第一页| 欧美福利在线| 欧美亚洲一级片| 午夜视频网站| jlzzzjlzzz国产免费观看| 欧美性爱在线播放| 国产精品九| 久久精品欧美一区| 手机AV永久免费| 人人妻人人澡人人爽人人| 一本大道高清香蕉中文大在线| 国产九九热| 色情五月| 久久久久亚洲av无码专区体验| 麻仓优下马第三部| 欧美精品HD| 亚洲愉拍自拍另类图片| aV在线亚洲天堂| 四平青年完整版高清| 91亚洲国产成人精品一区二三 | 麻豆传煤官网APP入口在线网站免费| 亚洲 成 人 视 频 在 线| 国产国语亲子伦亲子| 精品免费一区二区三区| 久久国产AV| 亚洲丁香婷婷| 国产熟人AV一二三区| 91精品影视| 久久久久免费视频| 国产无码在线电影| 亚洲免费视频网站| 无码H视频| 国产精品久久久久久久久动漫| 日本美女性高潮| 色精品视频| 多毛gfreeopm熟妇多毛| 一区二区中文字幕| 亚洲欧美一区二区激情| 麻豆传煤app官网网页入口下载| 一级黄片A| 激情小说综合网| 国产精品va无码一区二区欧美| 丁香五月开心婷婷| 亚洲精品久久久中文字幕| 国产精品久久久久久久久免费高清| 久久午夜福利影院| 久章草在线中文字幕| 天天干,天天日| 公借种日日躁我和公乱| 国产精品视频一| 亚洲日本香蕉视频观看视频| 伊人国产女| 我要看18毛片| 日日操日日| 无码国产一区二区三区四区公司| 日韩无码精品久久| 亚洲毛片在线| 丁 香 五 月 网| 女人被狂躁到高潮20次| 国产亚洲一区二区在线观看| 蜜臀久久99精品久久久久久| 日韩又粗又大| 精品午夜国产福利观看| 97操碰| 最好好看的中文字幕| 91在线无码观看| 丰满少妇黑森林A片| 六月激情网| 国内久久久| 熟妇~x88av| 久久99无码精品一区二区三区| 麻.COM豆传媒| 亚洲无码AV免费在线观看| 一本到高清视频不卡dvd日本| 无码高清免费视频| 国产AV大片| 2020中文字幕乱码免费| 精品欧美一区二区三区成人| 日本电影一区二区| 人人超碰在线| 久久久av网站| 国产美女黄性色A片| 爱爱一区| 国产Av电影网址| MD传媒免费进入在线观看| 欧美啊啊啊| 亚洲欧美一级久久精品| 97看片| 国产乱码色情一区二区三区四区| mdapptv麻豆下载| 最新黄色AV| 国产精品一国产AV麻豆| 在线国产视频| 精品一二| 欧美国产日产一区二区| 日韩精品一区二区三区四区蜜桃| 黄片在线视频免费观看| 国产在线精品福利大全| 岛国av一区| 靠比大全| 亚洲精品SUV精品一区二区| 日本电影二区| 欧美中文在线观看| 麻豆视传媒黄短视频| 章泽天在伦敦音乐节被偶遇| 操碰在线观看| 欧美三级在线播放线观看| 激情五月婷婷久久| 伊人AV影院| 午夜理论片日本中文在线| 99热影视国产一区二区三区| 麻豆传煤官网APP免费网站在线| 丁香婷婷久久久综合精品国产| 日本中出| 色哟哟影院| 日本一本二本无码免费视频| 蜜桃av久久久亚洲精品| 成人AV网站免费| 香蕉久久国产AV一区二区| 人人妻人人做| 国产乱伦影视| 麻豆传煤官网入口在线网站| 97在线免费视频| 欧美熟女一区二区| 久久精品国产AV一区二区三区| 久久精品电影| 超碰人人91| 波多野结喷水最猛一部352| 超碰在线公开| 亚洲第一二区| 亚洲精品45p| 蜜芽tv跳转接口点击进入网页| 日日夜夜天天| 麻豆精品在线| 大地资源二中文在线播放免费 | 欧美精产国品一二三| 欧美日本一道本| 亚洲福利一区| 白天操晚上操天天操| !精品国产99久久久久久| 麻豆传煤网站网址入口| 成人免费精品| 国产黄片一级| 久久精品亚洲作者| 麻豆传媒直播app下载官网 | 天天天天色| AV蜜臀在线网站| 亚洲精品推荐| 91插逼| 亚洲成人色综合| 天天色情站| 精品九九| AV噜噜在线观看| 国产88AV| 亚洲精品久久7777777国产| 久久综合色鬼| 亚洲一级黄色电影| 清纯唯美亚洲激情| 大地资源二中文免费第二页| 亚洲视频一区| 懂色av粉嫩av色老板| 人人人人人操| 美女禁止的网站免费| 老司机亚洲精品| Julia一区| 狠狠躁18三区二区一区| 国色天香成人社区| 暖暖日本手机免费观看TV| 超碰天天| 在线看麻豆| 亚洲国产精品成人精品A片| 天天夜碰日日摸日日澡性色AV| 99精品在线| 日韩免费视频一区二区| 色欲AV亚洲AV永久精品| 91色在线| 男人j捅女人p| 偷玩朋友漂亮醉酒人妻| 国产伦精品一区二区三区四区五 | 7799日日夜精品日日夜精品| 国产视频中文字幕| 怡红院在线 视频免费| 台湾MD豆传媒APP网址入口| 伊人久久大香线蕉综合网站| 色淫网站| 人人操人人爱人人爽| 成全视频在线观看免费高清下载| av天堂.com| 亚洲日本久久| 国产精品久久久久久久裸模| 国产精品2020| 人妻熟女斩五十路0930| md传媒免费资源在线观看下载| 日本久久久久久久| 日韩欧美人妻无码精品白浆| 欧美无乱码久久久免费午夜一区| 99热精品一区| 欧美色偷偷亚洲天堂bt| 黑人乱码一区二区三区AV| 在线电影无码| 草久久久| 夜夜操狠狠干| 麻豆传煤官网入口在线网站| 97色伦久久视频在观看| 亚洲AV成人无码久久精品巨臀| 中文字幕av日韩| 日韩精品人妻中文字幕有| 色五丁香| 成全电影大全在线观看| 精品久久久久久无码| 人妻少妇被猛烈进入中文字幕| 在线免费观看h| 精品国产久久久久久| 妇女性内射冈站HDWWW000| (高H)玩淫高中生乖乖女| 久久久新| 无码精品一区二区三区在线播放| 一级内谢又粗又黄| 成人久久精品| 人人妻人人爽人人| 国产日韩精品一区二区三区在线 | 黑人巨大精品欧美一区二区| 超碰在线无码| 亚洲电影三区| 亚洲无码一区三区| 天天日夜夜做| 色一区| 熟女倶楽部1011熟女倶楽部| 麻豆传煤网站免费入口ios| 国产精品久久av| 日产亚洲一区二区三区| 国产精品一区在线播放| 91久久久久久久久久久久久| 99精品电影一区二区免费看| 丁香五月天的最新地址| 最近2018年中文字幕免费下载| 亚洲女同一区二区| 超碰97人人在线| 免费手机Av| 久久久久高清| 黑人一区二区三区四区五区| 国产又大又粗又爽| 最近的中文字幕大全免费| 桃色bt| 麻豆文化传媒剪映免费网站-欢迎您! | 麻豆文化传媒精品观看网站 | 亚洲AV在线观看| 麻豆传煤官网APP入口在线网站 | 色五丁香| 久久精品国产亚洲AV成人| 99视频精品全部免费 在线| 亚洲AV午夜精品一区二区三区| 国产精品无码二区| 尹人在线视频| 亚洲精品国产成人AV在线| 综合伊人久久| 久久久精品人妻av一区二区三区| 国产色情麻豆一区二区乐视| 色琪影院八戒无码| 亚洲AV无码久久精品色欲| 巨胸喷奶水WWW冈哺乳期| 在线你懂的| 色亚洲一区| 丁香五月婷婷在线| 污污内射在线观看一区二区少妇| 国产护士一级特黄大片| 99热这里只有精品99| 97国产精品免费无码视频蝌蚪网| 一级黄色免费网站| 中文字幕日本六区小电影| 2021半夜好用的网站| 麻豆视传媒官网免费观看| 狠狠精品干练久久久无码中文字幕| 一级日韩| 少妇高潮毛片色欲AVA片| 亚洲AV成人一区二区三区不卡| 亚洲国产不卡| 国产无码日韩| 黄片AV在线| 色婷婷久久久亚洲一区二区三区| 黄片免费在线播放| 色欲久久久天天综合网| 久久免费视频| 国产电影精品一区| 91热久久免费频精品99欧美| 综合网婷婷| 国产人妻久久精品二区三区老狼| 大地资源在线影视播放| 最近中文免费国语在线观看 | 顶级欧美做受XXX000| 最近的2019中文字幕国语版| 97国产精东麻豆人妻电影 | 麻豆文化传媒精品观看网站| 亚洲 欧美 国产 另类卡通| 桃色AV久久无码线观| 在线 国产 欧美 专区| 色播成人网| 新97在线超级碰碰免费视频| 人妻精品无码一区| 中文字幕二区| 中文字幕人妻无码| 亚洲五月婷婷| 欧美激情亚洲| 成人女同av在线观看| 免费AV在线| 亚洲无码久久| 伊人一区二区三区| 性色AV网站| 琳琅社区导航入口| 97xxxx| 无码毛片A片-区二区三区| 国产无套精品一区二区三区| 欧美精品一级| 欧美男女性爱视频| 国产精品久久亚洲7777| 免费九九视频| 超碰人人爱| 久草成人网| 免费99精品国产自在在线| 国产精品久久久久国产A级| 久久久久久综合| 一二三四AV| www.成人| 777EY_卡通动漫_1页| 97xxxx| 五月激情综合网| 正在播放国产精品| 麻豆一区二区在我观看| 国产精品人妻一区二区99| 久9视频这里只有精品| 最好看的中文字幕免费大全| WWW亚洲精品久久久无码 | 中文无码有码亚洲 欧美| 四虎永久在线精品国产免费 | www.尤物视频| 日韩av在线影院| 看黄片链接| 久久这里有精品视频| 激情无码人妻| 一二三四区免费视频| 丰满少妇一区二区| 黄色av免费在线| www.嫩草| 亚洲AV成人一区二区三区啪啪| 最近2019免费手机中文字幕| 日本五月天婷久久网站| 久久人人槡人妻人人玩夜色AV | 日本无码专区亚洲麻豆| 伊人yinren6综合网色狠狠| 日产又大又黄又爽又猛| 国内激情| 伊人9999| 亚洲综合色域| 伊人99在线| 狠狠干影视| 飘零影院| 四房激情| 麻豆传煤网站入口直接进入不用| 大地资源影视中文二页| 丁香婷婷综合激情五月色| 久久看av| 国产精品美女高潮视频| 97无码精品人妻一区二区三区麻豆| 熟女中文字字幕在线乱码| 久热超碰| 日本熟妇多毛| 久久九九视频| 亚洲一二三四视频| 狼狼躁日日躁夜夜躁A片| 菠萝菠萝蜜在线观看视频| 精品人妻无码AV波多野结衣人妻| 大香蕉东京热| 欧美精品久久久极品| 久久一区二区三区| 日韩欧美v| 熟妇网站| 91在线看片一区国产| 入禽太深免费动漫在线观看| 国产成人精品亚洲777人妖 | 欧美性爱视频免费看| 国产精品无码一区二区三区可| 中国熟妇XXXXX| 婷婷丁香六月天| 成年男女免费视频网站| 麻豆传煤网站app入口直接进入404| 麻豆传煤官网入口免费进入| 精品人妻无码AV波多野结衣| 日韩激情片| 亚洲91av| 午夜无码福利在线观看| 国产免费中文字幕| 色综合99久久久无码国产精品| 野花视频在线观看免费3| 精品不卡高清视频在线观看| 福利无码在线| 91精品国产91久久久无码医生| 人人射人人| 激情综合色| 97人视频国产在线观看| 久就热视频精品免费99| 韩国精品一区| 久久99无码精品一区二区三区| 国产久久一区二区| 色综合www| 日本高潮视频| 亚区产品A级乱码| 国产69久久久欧美黑人A片| 一级精品视频| 黑人毛片免费看| 亚洲丝袜av| 亚洲精品99| 女人精69xxxxx舒心| 亚洲日本一区二区一本一道| 91久久香蕉囯产熟女线看蜜桃| 香蕉视频18| 亚洲AV日韩精品久久久久久久| 一区二区三区线日本| 大地影视中文资源官方网站| 亚洲色诱| 狠狠激情| 欧美熟妇另类久久久久久多毛| 91精品国产综合久久久密臀九色| 久久精品国产亚洲麻豆小说| 八戒八戒午夜A片| 国产剧情一区二区三区| 成人毛片18| 香蕉久久a毛片| 99热在线观看精品| 久久er99热精品一区二区 | 精品人妻久久久久| 国产成人综合亚洲AV第一页| 91精品人妻一区二区三区蜜臀| 国精品午夜福利视频不卡麻豆| ww.国产| 人妻91麻豆一区二区三区| 日韩中文无码字幕| 欧美日韩人妻精品| 日韩AV片无码一区二区三区不卡| 国产一区二区三区毛片| 精品综合久久| 亚洲综合网站| 丁香五月香婷婷五月| 欧美 日韩 综合 无码 专区| 成人久久视频| 久久国产中文字幕| 欧美日韩久久久久| 最近中文字幕MV在线视频2018| 亚洲午夜免费| 亚洲av久| 噜噜噜在线| 久久久国产精品福利免费| 久久久视频2019| 乱伦五月天| 草草影院国产| 国产精品高清电影| 国产无线乱码一区二三区| 国产精品无码人妻一区二区| 欧美午夜久久| 麻豆视传媒短视频的服务行业 | 亚洲AV久久无码精品影视| 青青操视频在线观看| 黄频在线观看视频| 五月丁香六月色| 91麻豆精品秘密入口| 码A片国产精品18久久久...| 色成人网站www永久免费观看| 成人h视频在线| 大地影视中文资源官网| 香蕉AV久久一区二区三区| 色久婷婷综合在线亚洲| 99热免费|