山東電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過(guò)是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線(xiàn)工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(pán)(槽)或梯架直線(xiàn)段、彎通非直線(xiàn)段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見(jiàn)圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線(xiàn)相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線(xiàn)銅芯接地線(xiàn),接地線(xiàn)小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線(xiàn),但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無(wú)與其他設(shè)備、管線(xiàn)交叉或重疊無(wú)法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線(xiàn)段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無(wú)棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無(wú)蓋無(wú)孔封閉型托盤(pán),當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤(pán)或有孔托盤(pán)及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤(pán)或梯架時(shí),應(yīng)選用中間有隔板的托盤(pán)或梯架;在托盤(pán)、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩ǎ灰蚴芸臻g條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤(pán)、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤(pán)、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤(pán)、橋架規(guī)格的承載能力應(yīng)滿(mǎn)足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤(pán)、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤(pán)、梯架直線(xiàn)段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤(pán)、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類(lèi)彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤(pán)、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤(pán)、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿(mǎn)足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類(lèi)防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類(lèi)別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀(guān)檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠(chǎng)檢驗(yàn)報(bào)告。托盤(pán)、梯架板材厚度應(yīng)滿(mǎn)足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤(pán)、橋架鍍層表面應(yīng)均勻,無(wú)毛刺、過(guò)燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無(wú)氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無(wú)損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤(pán)電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠(chǎng)日期電纜相應(yīng)完好無(wú)損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀(guān)完好無(wú)損,鎧裝無(wú)銹蝕、無(wú)機(jī)械操作,無(wú)皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無(wú)漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無(wú)老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線(xiàn)→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線(xiàn)袋或畫(huà)線(xiàn)沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線(xiàn)或畫(huà)線(xiàn),并均勻檔距畫(huà)出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見(jiàn)本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無(wú)顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無(wú)卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無(wú)顯著變形,焊接前厚度超過(guò)4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線(xiàn)盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以?xún)?nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

 ?。?)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線(xiàn)段結(jié)合處300~600mm的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿(mǎn)足規(guī)范小彎曲半徑。見(jiàn)表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門(mén)型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門(mén)型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開(kāi)角螺栓,用開(kāi)角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  圖3.1.5.(2-1) 角鋼支架預(yù)埋安裝

  Figure 3.1.5. (2-1) Pre embedded installation of angle steel bracket

  圖3.1.5.(2-2) 鋼支架預(yù)埋地腳螺栓安裝

  Figure 3.1.5. (2-2) Installation of pre embedded anchor bolts for steel supports

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線(xiàn)上。制作見(jiàn)圖和表3.1.5(3)底架與門(mén)型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  表 3.1.5(3)梯型角鋼支架制作尺寸表(mm)

  Table 3.1.5 (3) Dimensional Table for Manufacturing Ladder Type Angle Steel Supports (mm)

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  圖3.1.5(4c)異型鋼立柱在墻上側(cè)壁安裝作法之一

  Figure 3.1.5 (4c) One of the installation methods for special-shaped steel columns on the side walls of the wall

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無(wú)要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  表示3.1.5(5)與管道的小凈距

  Indicate the minimum clear distance between 3.1.5 (5) and the pipeline

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤(pán)、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線(xiàn)段鋼制電纜橋架長(zhǎng)度超過(guò)30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過(guò)15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無(wú)遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見(jiàn)圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過(guò)防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線(xiàn)路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線(xiàn)相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線(xiàn),接地線(xiàn)小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線(xiàn),但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤(pán)、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿(mǎn)足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專(zhuān)用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線(xiàn)連接。沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)托盤(pán)、梯架應(yīng)小有一點(diǎn)與接地干線(xiàn)可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線(xiàn)工程的一個(gè)配套項(xiàng)目,目前尚無(wú)專(zhuān)門(mén)的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠(chǎng)家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過(guò)程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類(lèi)型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線(xiàn)和電氣管線(xiàn)等設(shè)置情況、方便維修,以及電纜路由的疏密來(lái)確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線(xiàn)和分支線(xiàn)盡量避免交叉,如無(wú)其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線(xiàn)縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來(lái)確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開(kāi)列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線(xiàn)段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說(shuō)明,也可分段標(biāo)出用不同的剖面圖、單線(xiàn)圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過(guò)50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線(xiàn)垂直敷設(shè)時(shí),在纜線(xiàn)的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線(xiàn)的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開(kāi)啟面應(yīng)保持80毫米的垂直凈空,線(xiàn)槽截面利用率不應(yīng)超過(guò)50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線(xiàn)槽的纜線(xiàn)可以不綁扎,槽內(nèi)纜線(xiàn)應(yīng)順直,槽內(nèi)纜線(xiàn)應(yīng)順直,盡量不交叉,纜線(xiàn)不應(yīng)溢出線(xiàn)槽,在纜線(xiàn)進(jìn)出線(xiàn)槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線(xiàn)槽布放纜線(xiàn)應(yīng)每間隔1.5米固定在纜線(xiàn)支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線(xiàn)槽中敷設(shè)線(xiàn)時(shí),應(yīng)對(duì)纜線(xiàn)進(jìn)行綁扎。4對(duì)線(xiàn)電纜以24根為束,25對(duì)或以上主干線(xiàn)電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線(xiàn)的類(lèi)型、纜徑、纜線(xiàn)芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類(lèi)槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類(lèi)復(fù)合環(huán)氧樹(shù)脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤(pán)式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶(hù)外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤(pán) 。大跨距跨越公共通道時(shí),可根據(jù)用戶(hù)要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶(hù)外要選用復(fù)合環(huán)氧樹(shù)指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹(shù)脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過(guò)有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿(mǎn)足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見(jiàn)表橋架上電纜網(wǎng)絡(luò)中任一線(xiàn)路的自動(dòng)過(guò)電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線(xiàn)段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線(xiàn)接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)橋架應(yīng)少有一點(diǎn)與接地干線(xiàn)可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線(xiàn)段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說(shuō)明。4、有特殊要求的非標(biāo)件技術(shù)說(shuō)明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說(shuō)明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠(chǎng)家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說(shuō)明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類(lèi)槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類(lèi)復(fù)合環(huán)氧樹(shù)脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板?! ?、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤(pán)式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。  4、在公共通道或戶(hù)外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤(pán) 。大跨距跨越公共通道時(shí),可根據(jù)用戶(hù)要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶(hù)外要選用復(fù)合環(huán)氧樹(shù)指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過(guò)有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿(mǎn)足荷載的要求?! ?、橋架橫截面積的選擇見(jiàn)表   橋架上電纜網(wǎng)絡(luò)中任一線(xiàn)路的自動(dòng)過(guò)電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線(xiàn)段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線(xiàn)接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)橋架應(yīng)少有一點(diǎn)與接地干線(xiàn)可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線(xiàn)段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說(shuō)明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說(shuō)明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說(shuō)明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠(chǎng)家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說(shuō)明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由 濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://www.zrbg1.com/  真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.zrbg1.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Stay tuned

上一篇:濟(jì)南電纜橋架安裝施工要求及規(guī)范
下一篇:濟(jì)南電纜橋架到底需不需要跨接
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318
中文字幕影片免费在线观看| 欧美69AV| 色噜噜在线| 午夜影视| 大地影视中文资源官网| 手机在线亚洲国产精品| 懂色AV一区二区国产中文在线播放| 久久精品性爱视频| 日本精品视频免费观看| 人妻超碰| 真实女人揄情揄拍视频| 最近免费字幕中文大全| 免费黄色小说在线观看| 在线综合色| 一个综合色| 麻豆传煤网站app入口直接进入404 | 97超碰A片人人爽人人澡97| 麻豆视传媒短视频网站-入口2021仙踪林免费 | 懂色一区二区三区免费观看| 最近中文字幕高清免费MV| 国产AV麻豆MAG剧集| 四虎成人午夜影视亚洲精品| 久久久久久久人妻无码中文字幕爆| 岛国精品一区二区三区| 9420在线观看视频| 久久久国产精品成人免费| 精品人妻互换一区二区三区| 日韩免费中文字幕| 色伦专区97中文字幕| 欧美午夜精品一区区电影| 天天舔天天爱| 三级在线无码| 最近中文字幕完整版2019| 日韩有码一区二区三区| 亚洲特黄一级| 国产av黄色| 大地资源第二页在线观看完整版| 久久婷婷国产麻豆91| 国产精品免费一区| av中文字幕网| 精品区2区3区4区产品乱码9| 麻豆成人AV在线观看| 精品色综合| 国精产品W灬源码1688伊| 婷停五月深爱五月| 少妇被大黑捧猛烈进| 日韩电影二区| 国产suv精品一区| 国产伦精品一区二区三区免费观| 香蕉狠狠爱| 美女131湿影院| 入禽太深免费完整版视频| 激情四射网站| 91精品综合久久久久久| 蜜臀AV夜夜澡人人爽人人| 久久夜色精品国产欧美一| www无码视频| 欧美一区二| 蜜桃视频成人A片免费观看| 8050午夜一级| 丰满少妇被猛烈高清播放| 18和谐综合色区| 无码加勒比| 日韩福利视频一区| 小草视频免费高清在线播放| 国产精品伦理一区| 精品国产AV一区| 亚洲国产日韩一区二区A片| 欧美一级毛片日韩一级| 久久精品中文| 大香伊蕉在人线国产免费| 日韩乱伦视频| 日韩无码专区| 国精产品自线在| 色一情一区二区| 日本国产欧美| 久久视频在线视频观看天天看| 国产视频97| 人人做人人爽人人爱| 福利啪啪吧| 97香蕉| 精品人妻码一区二区三区| 暖暖日本免费观看更新2019 | 久久亚洲AV成人出白浆无码国产| 白浆导航| YY在线观看视频| www.日本av| 在线观看成人av| 清纯学生在教室被C叫床声| 先锋影音av无码第1页| 日韩一级a| 亚洲黄色大片| 啪啪啪福利视频| 赵心童夺冠前女友| 色情五月天色婷婷| 亚洲伊人天堂| 青青草一区| 免费看的视频网站| 国产av无遮挡| 湿妺影院免费观看| 国产精品25p| 欧美日韩中文一区| 国产内射合集颜射| 色久悠悠欧美精品亚洲精品久久久| 99这里有精品热视频| 丰满熟妇无码久久久| 99久久精品国产91久久久| 日本视频免费观看的网站| 一本色道久久99精品综合| 欧美1级黄片| 国产在线观看香蕉视频| 久久频| 影音先锋中文无码一区| 红桃成人无码免费网站| 日韩精品首页| 国产又粗又大又爽| 国产三级久久| 69久久国产露脸精品国产| av超碰在线| 麻豆啊传媒app下载| 亚洲AV影院在线观看| 日韩欧美亚洲国产| 自拍 另类 图片区 亚洲| 国产一卡二卡三卡| 精品国产高清毛片A片看| 亚洲 成人 无码 在线观看 国产| 伊人网视频| 无码欧美成人XXXXX| 久久久亚洲一区二区三区| 亚洲三级片网站| 加勒比一区二区| 免费撕开奶罩揉吮奶头A片视频| 欧美成人国产精品高潮| 九九热线有精品视频86| 校园春色人妻| 中文字幕日本在线观看| 亚洲女人毛片| 天美传媒麻豆MDXXXX| 91人人爽人人爽人人爽| 久久久96人妻无码精品| 自慰网站在线| 少妇特黄a一区二区三区| 国产精品美女乱子伦高潮| 精产国品一区二区| 五月丁香婷婷爱| 337p日本欧洲噜噜噜噜| 美女内射网站| 野草一二三乱码区地址| 日本大香蕉视频| 毛片免费观看网站| 色偷偷偷偷| 99r8这是只有精品视频20| 偷偷要色偷偷| 最近中文字幕高清MV在线| 午夜福利视频合集1000| 色婷婷国产精品| 久久AV国产麻豆HD真实| 一本色道精品综合久久无码人妻| 大地资源在线观看中文第二页| 久久伊人在| 丁 香 五 月 网| 久久av影院| md传媒官方网站入口免费| 日本一二三区在线视频| 麻豆视传媒短视频黄入口| 日本久久高清| 乳欲办公室HD| 久久久久久国产精品一区| 亚洲 国产专区 校园 欧美| 日本成人免费在线| 亚洲29p| 91精品久久久久久综合五月天| 99热这里有精品| 精品国产乱码久久久久久蜜臀网站| 蜜桃视频久久| 久久伦理视频| 久久九九免费| 精品99久久久久成人| 激情五月开心婷婷深爱| 久久色在线| 大地资源二在线视频观看| 久久久久久高清| 掀开奶罩边躁狠狠躁转学生H | 留学生刘玥与洋外教的关系| 欧美顶级居家私拍| 国产一区二区在| 69久久国产露脸精品国产| 精品1区| 人妻熟女一区二区AV| 欧美精品久久久久久久自慰 | 大地影视资源官网入口| 亚洲色天| 色情一区二区三区免费看| 久久久免费电影| 日韩精品一线二线三线| 久久一区二区三区精华液| 亚洲精品99999| 久久这里只有是精品23| 中文字幕无码人妻AAA片| 91网站 精品| 爽灬爽灬爽灬毛及A片免费看| 欧美激情久久久久久| 日本公与妇在线观看| 麻豆视频在线免费看| 大地资源网在线观看免费官网| 无套内射视频在线观看| nba录像回放| 精品一区二区三区AV天堂| 亚洲天堂中文| 成人网站YSL千人千色| www夜片内射视频日韩精品成人| 宝贝乖把胸罩脱了腿张开视频| 日韩午夜福利电影| 伊人婷婷色| 麻豆在视频线| 国产一级内射| 91丨九色丨丰满| 大地资源网最新在线播放| 99午夜| 国产乱码在线| 暖暖直播在线观看中文| 色婷婷狠狠爱| 日本国产高清| 女人与牲囗牲恔视频免费| 亚洲精久久| 99国产在线精品视频| 欧美日韩一级视频| 高清不卡视频| 97亚洲狠狠色综合久久久久| 国产精品久久777777| 老司机福利在线观看| 亚洲阿v天堂在线2017| 97人人在线视频| 精品国偷自产一区二区三区| 日韩av吉吉 影音先锋| 日韩大片免费| 少妇做爱视频| 播五月开心婷婷综合| 亚洲www| 日韩精品成人无码专区免费| 丨九色丨国产人妻| 香蕉有码在线视频发布| a天堂中文在线| 午夜福利站| 拔擦拔擦X8X8华人免费| 色呦呦免费视频| 久久久综合| 成人亚洲A片V一区二区中出片| 伊人网视频| 男人天堂av网| 日韩人妻高清无码| 仙踪林视频最新入口| 激情人妻无码| 熟妇人妻中文AV| 丁香成人文学| 免费人妻精品一区二区三区| 人妻精品无码一区二区| 日韩欧美一区二区在线观看| 高清欧美性猛交xxxx黑人猛交| 无码精品人妻一区二美国区三区| 日韩午夜三级| 免费播放片高清视频| 欧美a∨| 少妇久久| 无码国精品一区二区免费jazz| 婷婷五月花| 欧美色图久久| 国产成人综合亚洲| 欧美美女自慰网站| 新区乱码无人区二精东| 国产精品久久久久毛片大屁完整版| 久久香蕉国产| 午夜久久网| 中文字幕人妻少妇引诱隔壁| 欧美日韩黄片| 黄色国产精品| 国产乱╳╳╳╳性视频大全| 青久久久视频2019| 午夜毛片| 久久久久三级片| 久久人人澡| 久久视频这里都精品| 亚洲精品久久久久无码AV片软件 | 视频在线观看免费观看完整版| 亚欧洲精品在线视频免费观看| 少妇又色又紧又黄又刺激免费| 少妇aⅴ| 青春禁区视频播放在线观看| 久久综合中文| 午夜影院试看五分钟| 毛片av中文字幕一区二区| 亚洲精品久久无码AV片亚洲| 人超碰| 国产无码AV一区| 精品一区中文字幕| av最新精品| 成全电影免费看| 人人爽人人爽| 国产精品久久久久久吹潮| 国产精品自拍99| 欧美99视频| 成全电影大全在线观看国语高清| 亚洲精品亚洲人成人网| 精品一区二区三区四区| 国产日韩在线视频| 精品国产黄| 精品麻豆一卡2卡三卡4卡乱码| 99热这里只有精品免费国产 | 亚洲免费在线观看视频| 亚洲熟妇HD| 黑人与饥渴少妇在线| 亚洲成人AV免费在线观看| 大地电影资源第二页| 午夜理论片日本中文在线| 在线免费观看黄色av| 男人操女人的网站| 免费AV大片| 国产精品国产三级国产AV麻豆| 一本色道婷婷久久欧美| 亚偷熟乱区婷婷综合| 99久久精品免费| www.亚洲av.com| 男人天堂av无码| 久久丫精品系列| 国产福利小视频尤物98| 六月婷婷五月丁香| www.热久久| 国产乱伦精品一区二区| 日韩永久| 精品福利在线视频| 91tv成人精品人妻91资源| 在线A亚洲老鸭窝天堂AV高清| 免费精品国自产网站| 黄色无码免费看| 久热无码视频| 一本一道人妻久久久久久久中文字幕| 天天干天天色| 青娱乐青青草草9| 日本一卡二卡新区入口| 日韩少妇一区二区三区| 久久无码专区| 人人妻人人藻人人爽欧美一区| 午夜福利入口| 亚洲欧美日韩第一页| 99热99| 日韩精品久久久肉伦网站| 97最新网址| 久久国产一区二区| 国产麻豆精品久久一二三| 中文人妻av| 国产a自拍| 乱伦无码视频| 国产精品第9页| 亚洲色国产| 91高清无码在线观看| 最近更新中文字幕2019年高清电影 | 五月开心播播网| 欧美乱伦视频| 欧洲熟妇色| 少妇无码| 精品中文字幕在线观看| 尤物视频黄| 人与物videos另类与蛇交| 色欧美视频| 欧美国产高潮xxxx1819| 成人娱乐网| 日韩欧美中文字幕一区| 大地资源二中文在线官网| AV蜜臀在线网站| 97在线视频免费人妻| 精品久久中文字幕| 成人综合在线视频| 欧美日韩亚洲综合| 在线无码视频| 激情婷婷六月| 97久久精品视频| 日韩国产区| 亚洲AV无码免费看| 精品国产人妻AV多野结衣| 中文字幕在线播放视频| 亚洲三级av| 亚洲 av 高清| 97香蕉碰碰人妻国产| 亚洲AV成人无码精品区| 国产美女高潮无套91| 亚洲色成人中文字幕在线| 日本乱码中文在线观看| 538在线观视频免费观看| 国产婷婷色一区二区三区在线| 精品精品国产欧美在线| 甜性涩ai| 最近中文字幕MV高清在线视频| 暖暖 高清 在线 日本| 麻豆视传媒官网免费观看| 亚洲精品一区二区三区2023年最新电影 | 亚洲国产成人精品一区二区三区| 美女被男人操逼| 99这里只有是精品2| 日本午夜精品久久久无码| 国产亚洲AV综合一区二区A片| 大地影视资源中文官网| 大地资源网二在线观看完整版 | 暖暖直播免费观看手机版| 在线播放极太黑炮vs绝伦美女| 91国内在线视频| 日本午夜精品一区二区三区电影| 久欠re热这里有精品视频| 九九热线精品视频16| 大地资源国产精品系列| 亚洲热影院| 麻豆视传媒官方网站入口在线| 国产麻豆MD传媒视频| 麻豆传煤网站APP下载| 日韓無碼人妻不倫A片| 噼里啪啦在线看免费观看直播| 嘟嘟嘟视频在线观看免费版高清| 中文乱码字幕无线观看| 免费 a视频| 亚洲国产精品二二三三区| 图片区 亚洲 在线视频| 欧美亚洲高清国产| 亚洲精品高清AV在线播放| 久久偷拍人| 99精品久久久久| 美女Av影院| 亚洲在线成人视频| 中文字幕精品亚洲熟女| 午夜福利午夜福利| 亚州精品免费视频| 午夜毛片在线观看| 日日操天天操夜夜操| 欧美日韩国产三区| 日日爽夜夜爽| 湿妺影院免费观看区| 麻豆视传媒官方网站入口| 麻仓优下马第三部| 成AV人片一区二区三区久久| 99视频69e精品视频| 69视频成人| 91高清无码在线| 免费无码a| 手机AV免费| 精品国产人妻AV多野结衣| 久久伊人一区| 欧美日韩系列| 国产传媒精品| 亚洲视频91| 最近中文字幕高清免费MV| 青青青草国产费观看| 欧美无人区码AAAAA| 色四虎| 欧美综合另类| 午夜大香蕉| 亚洲成人 av| 欧美日韩在线电影| 丁香五月激情久久| 久九九精品免费视频| 野花日本免费完整版高清版直播| 精品精品国产欧美在线| 日产国产欧美韩国在线 | 日韩三级黄色| 无码二区在线观看| 九九精品99久久久| 美日韩无码视频| 久久久夜夜夜| 啦啦啦在线视频免费观看正在播放1| 成全影视在线观看| 麻豆传煤传媒网址在线观看| 精品久久久999| aaa无码| 中文字幕韩日| 狠狠爱综合| 日韩一区二区中文字幕| 橘子视频老司机破解版下载| 九九热久久只有精品2| 国产精品成人3p一区二区三区| 国产精品美女WWW| 亚洲天堂中文| 欧美亚洲色综久久精品国产| 国产91熟女高潮一区二区| 熟女毛毛多熟妇人妻AV| 大地影视资源中文官网| 欧美日韩亚洲在线观看| 偷拍亚洲另类| 无码丰满人妻| 日韩香蕉网| va天堂va亚洲va影视中文字幕| 一本色道婷婷久久欧美| 国产夜夜夜| 亚洲av久| 日韩精品一区二区亚洲AV观看| 在线偷拍视频精品视频| 中文字幕在线电影观看| 久热久热久热| 在线观看免费国产| 久久亚洲欧美| 人人爽人人爽| 成全视频在线观看高清版| 91在线精品视频| 国产精品99精品无码视| 98av在线观看| 欧美aaa| 暖暖直播在线观看中文| 久久AV国产麻豆HD真实乱| 一区二区三区免费精品| 69av在线播放| 久久国产v一级毛多内射| 大香伊蕉人在播放视频| 亚洲精品高清AV在线播放 | 伊人精品综合| 婷婷丁香五月婷婷| 日韩精品一二区| 中国女人内射6XXXXX| 欧美天天性爱| 日韩中文字幕在线看| 久久综合久久鬼| 一级全黄少妇性色生活片 | 四虎影视永久无码精品| 三级偷拍| 精品视频免费看| 欧美偷拍综合| a天堂资源在线观看| 在线看黄色小说| 久久av高潮aV| 中国性老太hd大全| 大地资源网中文在线观看免费节目| 亚洲欧美成人综合| 色欲com| av综合| 色欲AV亚洲AV永久精品| 国产1区在线| 日屄视频在线观看| 精品久久久久中文字幕人妻| 成全视频在线观看免费播放| 日韩精品第三页| 呦呦国产| 久久无码精品| 四虎国产精品成人永久免费影视| 亚洲精品第一页| 欧美日韩一级黄色片| 国产日韩精品一区| 不卡高清AV手机在线观看| 69精品一区二区三区无码吞精| 日本乱伦中文字幕| 果冻传媒麻豆浮生视频| 亚洲精品乱码久久久久久麻豆不卡| 黄色污污视频| 亚洲黄色av| 国产精品亚欧美一区二区三区| 四虎国产精品成人免费入口| 国产日本在线| 麻豆传煤网站APP入口直接进入在线JIAN | AV一级毛片| 色哟哟精品人妻| 国产精品美女高潮视频| 国产精品美| 人妻少妇久久中文字幕一区二区| 午夜dj在线观看免费完整高清视频 | 欧美阿v高清资源不卡在线播放 | 大地资源网中文第二页的在线观看| 97公开免费视频| 国产在线不卡AV| 蘑菇成品人APP下载| 天天操天天日天天操| 欧美成人精品H| 欧美日韩不卡合集视频| 精品人妻伦九区久久AAA片麻豆| 操逼毛片视频| 无码精品人妻一区二区湖北九色| 五月综合视频| 天天干夜夜艹| 精品久久一区二区| 欧美综合久久| 亚洲蜜桃av一区二区| 亚洲激情在线| 成人不卡视频在线观看| 91久久中文精品无码中文字幕| 国产精品熟女| 日韩精品一区二区在线| 亚洲熟妇女| 国产熟女乱伦| 无码中文电影| 一级特黄aa大片欧美| 暖暖 在线 观看 免费 韩国| 中文字幕亚洲激情| 高清不卡无码| 成全视频大全高清全集免费观看| 69无码人妻一二三区| www.国产视频| 国内精品自在自线视频| 亚洲精品一区二区巨| 变态另类视频一区二区三区| 欧美性生交XXXXX无码专区| 国产91一区二区三区| 亚洲精品少妇| 亚洲操| 日韩香蕉视频| 最近中文免费国语在线观看 | 亚洲av无码一区二区乱子伦| 国产精品17c| 色哟哟影院| 91在线无码观看| 欧洲专线二三四区| 亚洲色伊人| CAOPORN国产精品免费视频| 久久丫精品系列| 免费操逼| 丝瓜草莓向日葵秋葵加油站| 国内精品一级毛片国产99| 四虎永久在线精品免费网址 | 粉色视频午夜网站入口| 多地公告停课停运景区关闭| 麻豆文化传媒APP免费看| 91人妻人人澡人人爽人精品| 亚洲成人AV片| 粗大的内捧猛烈进出A片黄| 国产互换人妻好紧4P电影 | 日本一卡二卡三卡四卡网站99| 99久久久久久久| 国精产自导拍| 婷婷爱五月| 久草热8精品视频在线观看| 九九视频这里只有精品| 在线播放无码后入内射少妇| 操老熟女视频| 欧美精品www| 日韩人妻精品久久日| 久久大香蕉网| 成全在线观看免费完整| 国产区精品| 国产99在线a视频| 久久五月天激情| 少妇喷水视频| 91高清无码在线| 99黄色网| 99热这里只有精品在线观看| 欧美图片一区二区| 亚洲精品午夜一区二区电影院| 九九综合九九| 麻花传媒剧国产MV入口在线观看| 亚洲图片自拍| 日韩一卡2卡3卡4卡2020免费视频| 菠萝蜜视频免费观看| 免费无码不卡视频在线观看| 黄色成年人网站| 日韩无码视频网址| 欧美亚洲高清国产| 狠狠干影视| 美足下的激 18p| 亚洲九九九九| 无限看免费视频在线观看| 窝窝午夜精品一区二区| 麻豆传煤官网APP免费入口| AV天堂亚洲欧洲| 琳琅社区600ucom美欧高清| 欧美性福利| 久久久久久久9| 风韵少妇性饥渴私密推油| 韩日在线| 天海翼一区二区三区四区| 综合久久久| 91AV电影| 日韩一区二区中文字幕| 久久免费看毛片| 久久久高清无码| 97国产精品免费无码视频蝌蚪网| 亚洲成人免费| 国产精品国产毛片| 日本久久久久| 视频高清无码| 国产一区二区三区久久| 午夜福利在线免费视频| 国产香蕉视频在线播放| 日韩黄色三级| 久99久热只有精品国产99| 欧美午夜精品一区二区三区电影| 国产精品v欧美精品v日韩精品 | 欧美性猛交| 麻豆精品在线| 国产 欧美 亚洲 中文字幕| 久久性爱网站| 麻豆文化传媒官方网站入口免费 | 明星av换脸一区二区三区| 麻豆AV无码精品一区二区| 日韩AV成人无码久久电影| 理论片手机在线看片免费| 日韩夫妻性生活| 一线免费视频BD高清| 亚洲区 欧美区| 欧美性猛交XXXX乱大交丰满O | 国产伦精品一区二区三区高清版| 大地资源二中文免费第二页| 在线观看国产一区二区三区| 中文字幕欧美一区| 伊人99| 久久久91视频| 91精品专区| 亚洲黄色成人| 最近中文字幕无吗2018| 一区久久久| 大桥未久qvod| 久久久www| 少妇激情一区二区三区视频小说 | 肉大捧一进一出免费视频| 国精一区二区三区| 2020国自产拍精品天天更新| 国产精品1234| 亚洲AV永久无码一区二区三区| 交资源www在线观看| 夜夜春视频| 午夜神马| 国产精品一页| 色欲久久综合亚洲精品蜜桃| 亚洲日本色图| 手机AV永久免费| 国产九九精品| www.欧美在线| 黑人欧美巨大xxxxx69| 久久久www免费人成人片| 少妇三级全黄| 亚洲精品无码苍井空A片| 亚洲少妇性爱| 思思re热免费精品视频66| 国产麻豆精品久久一二三 | 亚洲国产日本| 97国产揄拍国产精品人妻| 色综合激情| 精品人妻一区二区三区四区色欲| 亚洲精品久久久AV无码专区| 亚州色图欧美色图| 激清电影| av黄色在线| 蜜桃视频入口| 日本2021免费一二三四区| 五月丁香中文| 黄色国产三级片| 免费看麻豆文化传媒| 亚洲无码久久久久久久| 欧美日韩一区二区三区| 神马影院在线| 久久久久久99| 自拍视频亚洲综合在线精品| 99久久精品日本一区二区免费| 亚洲久久视频| 人妻无码AV久久一二三区| 中文字幕性爱| xo动图| 成人女同av免费观看| 久久99AV无色码人妻蜜桃| 天堂а√在线中文在线新版| 国产成人视频在线| 四房婷婷| 久久成人影片| 欧美三级小说| 青青免费视频观看在线视频| 国产三级久久| 97视频久久久| 色琪琪av男人的天堂| 熟妇人妻中文字幕| 欧产伦精一区二区三区免费| 最近中文字幕2018最新电影| 日本中文字幕视频| 麻豆传媒免费观看| 蜜桃少妇AV久久久久久高| 国产精品一区二区三区不卡| 三级片久久久久久| 国产AV亚洲精品久久久久软件| 亚洲一区二区视频| 广东新冠感染病例呈上升趋势| 老汉色av影院| 久久精品国产精品成人片| 亚洲一区二区日本| 免费看的久久久久| 伊人婷婷综合| 免费看av的网址| 国产一级毛片一区二区| 麻豆星空九一视频在线| 另类欧美亚洲| 欧美黑大粗aaaaa级在线特区| 另类图片 五月| 久久精品国产亚洲AV无码麻豆| 国产免费福利视频| 87福利电影| 久就热视频精品免费99| 黄色小说三级| 日本久久一级片| WWW亚洲精品久久久无码| 人人大香蕉| 麻豆传煤网站入口直接进| 老女人任你躁久久久久久老妇| 毛片在线观看视频| 亚洲国产精品二二三三区| 亚洲无码性爱| 伴曲一对一视频软件| www.国产欧美| 中文区中文字幕免费看| 精品少妇人妻AV无码专区在线| 亚洲国产成人精品女人| 四虎国产精品永久一区高清| 婷婷丁香五月激情综合在线| 丁香色欲久久久久久综合网| 成人三级经典| 国产精品欧美激情第一页| A片日本人妻偷人妻人妻| 日本不卡久久| a毛片网站| 麻豆出品视频在线| 麻豆影视文化传媒app官网进入| 97精品久久| 超碰在线网站| 97在线看| www.99re7.cnm最新网站| 久久久毛片| 爆操黑丝美女| 亚洲国产精品二二三三区| 大地资源影视中文官网入口| 亚洲一本| 日韩欧美熟妇| 国产情侣激情自拍| 亚洲日本少妇| 中文字幕在线观看亚洲视频| 欧美性猛交99久久久久99按摩| 超碰在线亚洲| 国产又粗又大又黄的视频| 免费看的视频网站| 青青青爽视频在线观看| 99国产精品久久久久久久成人| 无码中文人妻| 国产性爱视屏| 最好看的中文字幕国语2019| 唐人社电亚洲一区二区三区| 精品国产青草久久久久福利| 欧洲色综合| 刺激的至亲乱45部之交换| av不卡高清| 夜夜情| 一区二区三区免费看A片| 人人妻人人要| 亚洲第一在线| 日日干日日操日日射| 成 人 社区在线视频| 麻豆传煤网站app入口直接进入404| 欧美久久久久久| 日本成人激情视频| 日韩亚洲欧美一区| 狠狠狠狠狠干| 天天干天天色综合| 99热久久国产精品这里有| 欧美视频一区| 国产乱码久久久| 国产精品一级毛片无码四季| 人人妻人人澡人澡人人精品少妇| 538在线在视观看视频| 久久精品99国产精品日本| 亚洲一区二区日本| 午夜激情视频| 天堂亚洲欧美日韩一区二区| 久久久99精品免费观看| 九九精品在线视频| 特级毛片www| AV在线高清无码| 亚洲无码高清一区二区三区| 夜夜春视频| 免费看的视频网站| 国产精品人妻久久久999| 成人欧美一区二区三区黑人免费| 亚洲色精品| 欧美精品一区视频| 涩涩涩涩| 成人AV不卡| 日本少妇被爽到高潮的动态图| av狼最新网址| 色欲久久精品AV无码| 国产全肉乱妇杂乱视频| 欧美亚洲激情视频| 日本电影二区| 亚洲图片自拍| 国产精品av| 国产麻豆福利AV在线观看| 操逼毛片视频| 国产高清中文字幕| 色播久久| 午夜性| 熟女少妇一码二码三码| 日韩在线小电影| 欧洲一卡2卡三卡4卡网站国色天香| 亚洲午夜无码久久久久蜜臀av| 精品人妻中文无码AV在线| 亚洲人成无码网站| 91女同| 色人天堂| 蜜桃av网| 国产二区视频| 亚洲欧洲日本在线| 免费欧美| 久操综合在线| 老色69久久九九精品高潮| 香蕉秋葵视频免费看小猪| av无码精品一区二区三区宅噜噜| 黄色av免费| 亚洲欧美一区二区三区在线| 懂色av无码精品| 亚洲国产日韩一区| 人妻激情偷乱视91九色| 在线视频99| 少妇激情综合| 99久久99九九99九九九| 麻豆出品视频在线| 精品一卡二卡三卡四卡视频区| 丁香最新网址| 暖暖直播最新高清完整视频| xfyy222每日稳定资源站姿| 人妻含泪被黑人进入| 天天操天天干天天日| 亚洲男人的天堂网站| 久久精品国产99国产| 涩里番免费一区二区三区| 天天干天天综合| 91亚洲国产成人精品一区二三| 99久久久国产精品免费最新章节| 日韩色无码| 日本久久一级片| 国产精品综合在线| 99久久99久久免费精品不卡| www午夜| 亚洲va欧美va国产va黑人| 国产av网站大全| 午夜福利视频欧美| 国产精品91在线| 99久久久久成人国产免费| 偷拍亚洲另类| 懂色av一区二区三区不卡| 男女激情视频在线观看| 丝袜美腿AV在线| 久久免费在线| 九九免费精品视频| 2020午夜福利| 日本不卡视频在线| 亚洲黄色中文字幕| 淫荡的人妻| 日韩午夜福利电影| 久久香蕉| 国产四区视频| 日韩欧美中文字幕在线视频| 处一女一级a一片AV| 久久久免费看片| 97在线精品| 伊人精品影院| 欧美在线v| 日本一本视频| 国产精品99精品无码视亚| 综合网久久| 日产久久视频| 69久久无码一区人妻A片| 新香蕉视频在线| 国精品午夜福利视频不卡麻豆| 东京热系列| 99久久精品费精品国产| 亚洲精品成AV人片天堂无码| 精品一区二区三区AV天堂| 顶级欧美做受xxx000大乳| 伊人综合和综合| 大胆日本无码一区二区| 日本一级做a爱片| 三级片久久久久| 日本多毛熟妇| 国产精品羞羞无码久久久| 午夜福利在线电影| 亚洲无码| 九九大香蕉视频| 亚洲精品aa| www.秋霞| 亚州一二三| 国产精品久久久久久久久午夜福利| 欧美天天干| 中文字幕亚洲欧美日韩在线不卡| 人人妻人人要| 久久av中文字幕| 成人欧美一区二区三区黑人麻豆| 久久精品国产精品成人片| 亚洲va欧美va国产va精品 | 和少妇人妻邻居做爰无码| 茄子视频ios丝瓜视频在线观看| 色翁荡熄又大又硬又粗又视频 | 国产精品av| 成人毛片视频免费看| 69精品无码一区二区| 日韩欧美一级大片| 午夜无码福利在线观看| 欧美另类熟妇| 久久久久久91香蕉国产| 一区二区三区无码视频| 亚洲 美腿 欧美 偷拍| 免费观看拍拍1000视频 | 好叼妞视频| 翔田千里无码A片| 神马久久久久久久久| 日韩在线精品视频| 久久久久久一区二区| 蜜桃麻豆WWW久久国产SEX| 果冻传媒免费观看4399飘雪 | 欧美一区二区三区久久综合| 2019天天爱天天拍| 91久久人澡人人添人人爽| 天天干天天日天天爱| 久久精品丰满少妇免费| 日韩成人三级| 亚洲中文字幕AV在线| 高清欧美性猛交xxxx黑人猛交 | 日本www色| 狼群视频在线观看高清免费| 777午夜福利理伦电影网| 久久久日韩精品一区二区| 日本免费一区二区视频| 午夜AV电影网| 亚洲视频一二三区| 91av在线视频观看| 久久精品三级片| 久久久99精品免费观看| 麻豆传煤APP免费网站在线下载| 成人做爰9片免费看网站| 草莓视频免费观看| av小说天堂网| 日韩一区电影| 九一成人视频| 精品国产无码一区二区三区| 五月丁香缴情深爱五月天| 暖暖直播在线观看免费完整版中文 | 久久久91人妻| 久久亚洲私人国产精品| 无码日本精品一区二区片| 最近更新中文字幕2018全集免费 | 91精品国产综合久久久不卡电影| 精品一区二区三区四| 男女男精品网站| 妺妺窝人体色WWW在线观看婚闹| 色吊丝av中文字幕| 福利视频在线4| 大地资源免费第二页| 97超级碰| 精品无码中出| 午夜福利视频欧美| 精品无码一二三区| 99久久99| 成全电影在线观看大全| 亚洲欧洲中文日韩久久AV乱码| 日本一二三不卡视频| 高清欧美性猛交xxxx| 久久精品精品| 激情一二三| 久章草在线中文字幕| 两性色黄视频在线观看| 男人色色天堂| 91精品久久久久| 在线综合色| 亚洲AV无码一区二区少妇| 丁香婷婷六月综合交清| 无限视频免费看片| 一曲二曲在线看| 青青草福利| 国产一二三四在线| 97xxxx| 国产在线观看香蕉视频| 国产成人无码一区二区| 久久久久久久久久久久国产精品| 万能影院| 人人妻人人爽| 欧美性猛交XXXX乱大交极品| 老妇a老妇女大黑毛| 色色色一区二区| 人人插人人看| 一级欧美日韩| 亚洲国产AV一区二区三区四区| 亚洲精品高清AV在线播放| 人人妻人人爽凹凸| 日韩和的一区二区区| 国产美女性爱视频| MD传媒免费观看在线小说| 五月婷婷一区| 国产精品成人久久久久| 亚洲电影三区| 国产精品黄色| 亚洲第1页| 日韩av一区二区在线| 久久免费看片| 伊人久久中文字幕| 成片免费观看视频潢片| 国产97视频在线观看| A级免费毛片| 亚洲AV无码专区在线观看成人9| 亚洲视频1区| 亚洲区中文字幕在线不卡电影| 日韩抽插| 美女一区二区视频| 91精品视频网站| 91香蕉视频在线看| 精品人妻一区二区三区久久| 国产三区四区| freehd人妻少妇xxxx| 最近更新2019中文字幕完整版| 人妻斩在线| 国产男女啪啪| 无码国产精品一区二区高潮| 国精产品自线在| 久久伊人爱| 日韩毛毛片| 九九精品在线视频| 开心五月丁香花综合网| 国产视频91在线| www超碰com| 青青草原精品国产亚洲AV| 内射h| 久操精品视频| 欧美精品一区二| 激情五月婷婷| 天天干天天舔天天射| 日韩18禁| 91精品久久久久久久| 午夜福利18禁视频| 五月天婷婷导航| 一区二区视频在线播放| 观月雏乃 bt| 成人免费高清无码| 久久国产精品无码一区二区| 99精品国产99久久久久久白拍 | 国精产品W灬源码1688伊| 久9视频这里只有精品| 国产免费av一区二区| 久久久免费电影| 日韩VS欧美VS亚洲VS无码| 五月天中文字幕在线| 超碰在线亚洲| 亚洲AV无码一区二| 日产一二三四区十八岁| 青青操久久| 丁香五月成人| 大地资源网在线观看免费官网| 亚洲精品99999| 欧美亚洲第一区| 四房色播电影| 久久av资源| 国产黄片在线播放| 麻豆传煤2021精品污| 美女视频网站免费| av天堂资源| 99视频这里只有精品20| 日本又大又粗又黄又猛视频 | 抽插的日日液液H|